1. How much has Nepal lost in the last decade due to load shedding? An economic assessment using a CGE model. World Bank Policy research working paper #8468;Timilsina,2018
2. World development Indicators,2020
3. Online database,2020
4. Load shedding time increases up to14 hours a day;The Himalayan Times,2016
5. Annual reports for the period between 2007,2019