1. Using indicators to describe distortion along a process chain;Klein;Mat.-wiss. u. Werkstofftech.,2006
2. Process chain configuration by design of technological interfaces;Tönshoff;CIRP J. Manuf. Syst.,2004
3. F. Klocke, M. Fallböhmer, A. Kopner, G. Trommer, Hilfsmittel fr die konstruktionsbegleitende Gestaltung von Prozessketten. Rob. and Comp.-Integr. Manuf., 2000, 16, 411.
4. Present situation and future trends in modelling of machining operations;Van Luttervelt;CIRP Annals Manuf. Tech.,1998
5. Technical supply chain planning;Schmidt;CIRP J. Manuf. Syst.,2003