1. Li Ming-fa, Li Xiu-wei. Comparison and analysis of on-board temporary support and manual temporary support. Coal Mine Safety, 2010, 433(11): 99-101. (in Chinese)
2. Zhao Zeng-hui, Zhang Jiang-zhong. Some recognitions on test of excavation and bolting integration. Coal Technology, 2006, 25(4): 49-51. (in Chinese)
3. Sun Xu-wei. Analysis and study on development of integration of excavation and bolting technology. Coal Mine Machinery, 2010, 31(3): 49-51. (in Chinese)
4. Zhao Xue-lei, Meng Guo-ying. Research and practice in key technology of rapid automate excavation and bolting support. Coal Mine Machinery, 2010, 31(12): 183-185. (in Chinese)
5. Zhougan. Discussion on the current development of roof bolter. Pneumatic Tools of Rock Drilling Machinery, 2006 (3). (in Chinese)