The Mechanism of Design Activity Overlapping in Construction Projects and the Time-Cost Tradeoff Function

Author:

Dehghan R.,Ruwanpura J.Y.

Publisher

Elsevier BV

Subject

Applied Mathematics

Reference9 articles.

1. A Guide to the Project Management Body of Knowledge (PMBOK® Guide), 4th Edition; 2008.

2. Concurrent engineering approach to reducing design delivery time”;Bogus;ASCE Journal of Construction Engineering and Management,2005

3. Dehghan R, Ruwanpura JY and Khoramshahi F. “Optimization of Activity Overlapping in Construction Projects”, ASCE Construction Research Congress (CRC 2010), May 8-11, 2010, Banff, AB, Canada.

4. Managing the simultaneous execution of coupled phases in concurrent product development” IEEE Trans;Krishnan;Eng. Manage.,1996

5. Pena-Mora F and Li M. “Dynamic planning and control methodology for design/build fast track construction projects”, Journal of construction engineering and management, vol. 127, N1.; 2001.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3