1. A Guide to the Project Management Body of Knowledge (PMBOK® Guide), 4th Edition; 2008.
2. Concurrent engineering approach to reducing design delivery time”;Bogus;ASCE Journal of Construction Engineering and Management,2005
3. Dehghan R, Ruwanpura JY and Khoramshahi F. “Optimization of Activity Overlapping in Construction Projects”, ASCE Construction Research Congress (CRC 2010), May 8-11, 2010, Banff, AB, Canada.
4. Managing the simultaneous execution of coupled phases in concurrent product development” IEEE Trans;Krishnan;Eng. Manage.,1996
5. Pena-Mora F and Li M. “Dynamic planning and control methodology for design/build fast track construction projects”, Journal of construction engineering and management, vol. 127, N1.; 2001.