1. Optimal pump scheduling in water supply systems with maximum demand charges;McCormick;Journal of Water Resources Planning and Management,2003
2. Farley, M., & Tarley, S. (2003). Losses in Water Distribution Networks: A Practitioner's Guide to Assessment, Monitoring and Control. London, England: IWA Publishing.
3. WDSA. (2014). Battle of Background Leakage Assessment for Water Networks (BBLAWN). Detailed Problem Description and Rules. Bari.
4. Losses in Water Distribution Networks: A Practitioner's Guide to Assessment, Monitoring and Control. Londres;Farley;Inglaterra: IWA Publishing,2003