Author:
Alizadehsalehi Sepehr,Yitmen Ibrahim
Reference32 articles.
1. The value of integrating Scan-to-BIM and Scan-vs-BIM techniques for construction monitoring using laser scanning and BIM: The case of cylindrical MEP components;Bosché;Automation in Construction,2015
2. Integrated Sequential As-Built and As-Planned Representation with D4ARD4AR Tools in Support of Decision-Making Tasks in the AEC/FM Industry;Fard;Journal of Construction Engineering and Management,2011
3. Visualization of Construction Progress Monitoring with 4D Simulation Model Overlaid on Time-Lapsed Photographs;Golparvar-Fard;Journal of computing in civil engineering,2009
4. Assessing research issues in Automated Project Performance Control (APPC);Navon;Automation in Construction,2007
5. A. Braun, S. Tuttas, A. Borrmann and U. Stilla, a concept for automated construction progress monitoring using bim-based geometric constraints and photogrammetric point clouds, Journal of Information Technology in Construction, pp. 68-79, 2015.
Cited by
46 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献