Author:
Agrawal S.,Gautam A.,Chauhan D.K.,Tiwari L.M.,Kapoor S.
Reference12 articles.
1. Allahverdi, A.; Gupta J. N. D; and Aldowaisan T., “A Review of Scheduling Research Involving Setup Consideration”, Omega, The international Journal of Management Science, Vol. 27, 1999, 219-239.
2. Belwal, O.K.; and Mittal, Amit, rdquo; N job 2 machine flow shop scheduling problem with breakdown of machines, transportation time and equivalent job block”, Bulletin of Pure and Applied Sciences, Vol.27E (No.1), 2008, 153-159.
3. Bianco, L.; Ricciardelli S.; Rinaldi, G.; and Sassano, A., “Scheduling Tasks with Sequence Dependent Processing times”, Naval Research Logistics, Vol. 35, (1988), 177-184.
4. Campbell, H.G.; Dudek, R.A.; and Smith, M.L., “A Heuristic Algorithm for the N Job, M Machine Sequencing Problem”, Management Science, Vol. 16, No. 10, 1970, 630-638.
5. Corwin, B.D.; and Esogbue, A.O., “Two Machine Flow Shop Scheduling Problems with Sequence Dependent Setup Times: a Dynamic Programming Approach”, Nav. Res Logistics Q, Vol. 21, No. 3, 1974, 515-524.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献