1. Low disturbance urban projects through smart manufacturing and building information modeling;Sebastian;Proceeding of Sustainable Intelligent Manufacturing (SIM),2011
2. FHWA, Accelerated Bridge Construction – Experience in design, fabrication and erection of prefabricated bridge elements and systems, 2011.
3. A product architecture-based conceptual DFA technique;Stone;Design Studies,2004
4. Highway England (HE), TRL: https://www.gov.uk/government/organisations/highways-england.
5. A14 Cambridge to Hungtingdon Improvement Scheme, TRL: http://www.highways.gov.uk/roads/road-projects/a14-cambridge-to-huntingdon-improvement-scheme/.