1. A.N. Konkov, V.N. Kavkazskiy, T.V. Ivanes, V.I. Khomutov, Assessment of the impact of forepoling maintaining the excavation face and the top heading on the stability of an excavation in tunnel driving of the road tunnel in Sochi Industrial and civil construction, N.6 (2012) pp. 23-26.
2. U.S. Frolov, T.V. Ivanes, V.N. Kavkazskiy, A.N. Konkov, Geomechanical tasks solving at road tunnel construction in Olympic Sochi, Transport RF, N.6 (2013) pp. 12-18.
3. L. Faravelli, Response surface approach for reliability analysis, J. Eng. Mech. ASCE, 115 (1989).
4. H. Stille, M. Holmberg, G. Nord, Support of weak rock with grounted bolts and shotcrete, Int. J. Rock Mech. Mining Sci. (1989).
5. J.C. Chern,. F.Y. Shiao, and C.W. Yu, An empirical safety criterion for tunnel construction. Proc. Regional Symp. on Sedimentary Rock Engineering, Taipei, Taiwan, Nov 20-22, (1998) pp 222-227.