1. Langdon, D. (2012). World Construction 2012. An AECOM Company. Najdeno, 30.
2. Al Turkey. (2011).The reality of projects in terms of organization and structure, and the reasons for success and failure In Saudi Arabia. Alwatan Newspaper. [Online] accessed on 12 March 2015 available from http://www.alwatan.com.sa/Local/News_Detail.aspx?ArticleID=49126&CategoryID=5.
3. Al-Ghafly, M.A. “Delays in Construction of Public Utility Projects in Saudi Arabia, KFUPM, Dhahran, Saudi Arabia.” (1995).
4. Al-Abidien, Z. HM (1983). About the effect of delay penalty on the construction of projects and modification proposal. Albogamy, A., Scott, D., & Dawood, N. (2012). Addressing Construction Delays in the Kingdom of Saudi Arabia. International Proceedings.
5. Al-Sultan, A.S. (1987). Determination of construction contract duration for public projects in Saudi Arabia (Doctoral dissertation, Master thesis, KFUPM, Dhahran, Saudi Arabia).