1. Chua, D. and Godinot, M. (2006). Use of a WBS Matrix to Improve Interface Management in Projects. J. Constr. Eng. Manage., 132(1), 67-79.
2. Lamers, M. (2002). Do you manage a project, or what? A reply to “Do you manage work, deliverables or resources”, International Journal of Project Management 20(4), 325-329.
3. Manewa, A., Pasquire, C., Gibb, A., & Schmidt, R. (2009). Towards Economic Sustainability through Aadaptable Buildings. Paper presented at the The 3rd CIB Conference on Smart and Sustainable Environments, Delft, Netherlands.
4. Beadle, K., Gibb, A., Austin, S., Fuster, A., & Madden, P. (2008). Adaptable Futures: Setting the Agenda. Paper presented at the 1st International Conference on Industrialised, Integrated, Intelligent Construction, Loughborough, UK.
5. Habraken, N. J. (2003). Open Building as a condition for industrial construction. Paper presented at the 20th International Symposium on Automation and Robotics in Construction, Eindhoven, the Netherlands.