Author:
Lin Hung-Tso,Liao Ching-Jong
Subject
Industrial and Manufacturing Engineering,Management Science and Operations Research,Economics and Econometrics,General Business, Management and Accounting
Reference27 articles.
1. Branch and bound algorithm for the flow shop with multiple processors;Brah;European Journal of Operational Research,1991
2. Complexity of parallel machine scheduling with processing-plus-wait due dates to minimize maximum absolute lateness;Cheng;European Journal of Operational Research,1999
3. Cheng, T.C.E., Sin, C.C.S., 1990. A state-of-the-art review of parallel machine scheduling research. European Journal of Operational Research 47, 271–292, 513–517.
4. Minmax earliness/tardiness scheduling in identical parallel machine system using genetic algorithms;Cheng;Computers and Industrial Engineering,1995
5. The two-stage flowshop scheduling problem with M machines at each stage;Deal;Journal of Information and Optimization Sciences,1991
Cited by
112 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献