Author:
Agarwal Sanchit Saran,Kansal Mitthan Lal
Reference51 articles.
1. Hydropower Status Report: Sector Trends and Insights,2019
2. An international comparative assessment of construction cost overruns for electricity infrastructure;Sovacool;Energy Res. Soc. Sci.,2014
3. Were the hydro dams financed by the World Bank from 1976 to 2005 worthwhile?;Awojobi;Energy Pol.,2015
4. Cost and schedule overruns in large hydropower dams: an assessment of projects completed since 2000;Plummer Braeckman;Int. J. Water Resour. Dev.,2019
5. Preliminary cost estimation model using case-based reasoning and genetic algorithms;Kim;J. Comput. Civ. Eng.,2010
Cited by
14 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献