1. Conceptual Design for the Everglades Protection Project;Burns and McDonnell,1994
2. Final Report on the Evaluation of Alternatives for the ECP Basins. October 2002. Report Prepared for the South Florida Water Management District;Burns,2002
3. Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals. October 2003. Report Prepared for the South Florida Water Management District;Burns,2003
4. The Use of Wetlands for Water Pollution Control. EPA-600/2-82-036;Chan,1982
5. Influence of inundation depth on Typha domingensis and its implication for phosphorus removal in the Everglades stormwater treatment area;Chen;Wetlands,2014