1. Enhanced system reliability using flexible ramp constraint in CAISO market;Abdul-Rahman;2012 IEEE Power and Energy Society General Meeting, July,2012
2. Flexibility in Europe's power sector – an additional requirement or an automatic complement?;Bertsch;Energy Econ.,2016
3. Designing ancillary services markets for power system security;Bolton-Zammit;IEEE Trans. Power Systems,2000
4. What the Duck Curve Tells Us About Managing a Green Grid. Technical Report;CAISO/CommPR/HS,2013
5. CAISO/GA&EK&DT, 2016. Flexible Ramping Product: Draft Final Technical Appendix. Technical Report. California Independent System Operator.