1. Munro & Associates, Inc., 911 W. Big Beaver Rd., Suite 309, Troy, Michigan 48084.
2. Manufacturing Producibility Handbook, General Electric Co., Manufacturing Services, Schenectady, NY, 1960.
3. Miyakawa, S. and Ohashi, T., “The Hitachi Assemblability Evaluation Method (AEM),” Proc. Int. Conference on Product Design for Assembly, Newport, RI, April 15–17, 1986.
4. Boothroyd, G. and Dewhurst, P., “Product Design for Assembly,” Designers Handbook, Boothroyd Dewhurst, Inc., 138 Main Street, Wakefield, RI 02879.
5. Development of an Automatic Assembly System for Tape-Recorder Mechanisms;Hashizume,1980