1. Fujimori, T. 1990, Development of flexible assembly system SMART, 21st International Symposium on Industrial Robot, 75-82
2. Fujimori, T. 1994, Effectiveness of Factory Automation Which Leads to Value Added Manufacturing, 25th International Symposium on Industrial Robot, OD-S1-13-20.
3. New Developments in Assembly Systems;Makino;CIRP Annals,1994
4. Planning and Scheduling of Assembly Systems;Van Brussel;CIRP Annals,1990
5. Wiendahl, H. P.1989, Shortening the Manufacturing Cycle of Products with Many Variants by Simultaneous Assembly Engineering, 10th International Conference on Assembly Automation, 11-29.