Author:
Liu F.,Luh P.B.,Moser B.,Kegg R.L.
Subject
Industrial and Manufacturing Engineering,Mechanical Engineering
Reference10 articles.
1. Risk Analysis for Large Projects — Models, Methods & Cases;Cooper,1987
2. Gou, L., Luh, P.B., Kyoya, Y., 1997, Holonic Manufacturing Scheduling: Architecture, Cooperation Mechanism, and Implementation, Proc. of IEEE/ASME International Conf. on Advanced Intelligent Mechatronics'97
3. Distributed Product Design;Krause;Annals of the CIRP,1994
4. Completion Time Variance Minimization on a Single Machine is Difficult;Kubiak;Operations Research Letters,1993
5. Luh, P.B., Liu, F., Moser, B., 1997a, Scheduling of Design Projects with Uncertain Number of Iterations, to appear in European J. of Operational Research
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献