1. Manufacturing Systems Configuration Complexity;ElMaraghy;Annals of the CIRP 54/,2005
2. Improvement of Process Reliability within Process Chains by Comprehensive Control;Warnecke;Production Engineering VI/,1999
3. Trommer, G., 2001, Methodik zur konstruktionsbegleitenden Generierung und Bewertung alternativer Fertigungsfolgen. Ph.D. Thesis, RWTH Aachen.
4. Technological Interfaces of Industrial Process Chains;Tönshoff;Production Engineering IX/,2002
5. Hybrid, AI-and Simulation-Supported Optimisation of Process Chains and Production Plants;Monostori;Annals of the CIRP 50/,2001