1. R.C. Murray et al., Seismic Review of the Robert E. Ginna Nuclear Power Plant as part of the Systematic Evaluation Program, NUREG 1CR-1821 (December 1980).
2. U.S. Nuclear Regulatory Commission, Asymmetric blow-down loads on PWR primary systems, NUREG-0609 (January 1981).
3. S.H. Bush, E.M. Patton and C.L. Wheeler, Water hammers in BWRs, EPRI NP-2590-LD (September 1982).
4. Electric Power Research Institute, 1982 NSAC Generic Experience Review, in preparation.
5. U.S. Nuclear Regulatory Commission, Interim requirements related to hydrogen control, Proposed Rule 10 CFR 50 (December 1981).