Author:
Sun Liangliang,Yang Ruimin,Feng Jing,Guo Ge
Funder
National Natural Science Foundation of China
Hebei Provincial Natural Science Foundation
Reference188 articles.
1. S.S. Sankar, S.G. Ponnambalam, V. Rathinavel, M.S. Visveshvaren, Scheduling in parallel machine shop: an ant colony optimization approach, in: 2005 IEEE International Conference on Industrial Technology, Hong Kong, China, 2005, pp. 276–280.
2. Solving vehicle scheduling problem with time window for truck and trailer of port;Huiling,2014
3. S. Nechita, L. Diosan, A four-Phase Meta-Heuristic Algorithm for Solving Large Scale Instances of the Shift Minimization Personnel Task Scheduling Problem, in: 2018 20th International Symposium on Symbolic and Numeric Algorithms for Scientific Computing, SYNASC, Timisoara, Romania, 2018, pp. 394–400.
4. The mobile sensor deployment problem and the target coverage problem in mobile wireless sensor networks are NP-hard;Nguyen;IEEE Syst. J.,2019
5. X. Wang, Z. Xing, W. Wu, X. Chen, Research on Coupled Task Allocation and Scheduling of Multi-type Robots, in: 2021 IEEE International Conference on Networking, Sensing and Control, ICNSC, Xiamen, China, 2021, pp. 1–6.