1. A proposed operational method for safe and quick retrieval of deepwater drilling riser during extreme hurricane;Abimbola,2020
2. FPDSO with near surface disconnect drilling system;Bye,2000
3. Coupled spar response with buoyancy cans versus tensioners;Chen,2008
4. FEM analysis of deepwater drilling risers under the operability and hang-off working conditions;Dai;J. Mar. Sci. Appl.,2009
5. Structural qualification and design challenges of the Atlantis deep water drilling concept;Gudmann,1998