1. A risk-based input-output methodology for measuring the effects of the August 2003 Northeast blackout;Anderson;Econ. Syst. Res.,2007
2. Italian Case Study: Socio-economic Impact Analysis of a Cyber Attack to a Power Plant in an Italian Scenario. Cost and Benefit Estimation of CIPS Standard Adoptions. A Reduced Version;Angeletti,2014
3. Report of the NOAA Panel on Contingent Valuation;Arrow,1993
4. Electrical Power Interruption Cost Estimates for Individual Industries, Sectors, and U.S. Economy;Balducci,2002
5. Polish Case Study. Scenario Based Assessment of Costs and Benefits of Adoption of Comprehensive CIP Standards;Bartoszewicz-Burczy,2014