1. Cost estimate classification system – as applied in engineering, procurement and construction for the process industries;Christensen,2005
2. Dalvi, A. D., Bacon, W. G., & Osborne, R. C. (2004). The Past and Future of Nickel Laterites. In Prospectors and Developers Association of Canada 2004 International Convention, Trade Show & Investors Exchange. March 7, 2004.
3. Beating US$10 per pound of installed capacity for a laterite nickel plant;Dolan,2004
4. Nickel mineral commodity report;Goonan;United States Geological Survey,2010
5. Flewelling, S. (2006). Analyst site visit Koniambo, 2006.