1. 99–03 Control Room Habitability Guidance;NEI,2003
2. AP1000 Design Control Document;Westinghouse,2013
3. REG Guide 1.197 Demonstrating Control Room Envelope Integrity at Nuclear Power Reactors;NRC,2003
4. Control room contaminant inleakage produced by door opening and closing: Dynamic simulation and experiments;Chang;Build. Environ.,2016
5. Control room habitability testing summary and lessons learned;Robert;27th Nuclear Air Cleaning and Treatment Conference, Nashville, USA,2002