1. Bond modelling of prestressed concrete during the prestressing force release;Benítez;Mater. Struct.,2011
2. P.G. Gambarova, Bond in reinforced concrete: where do we stand today?, in: W. Cairns, G. Metelli, G.A. Plizzari (Eds.), Bond in Concrete 2012: Bond, Anchorage, Detailing, Brescia, Italy, 2012, pp. 1–13.
3. Bond of 13mm prestressing steel strands in pretensioned concrete members;Martí-Vargas;Eng. Struct.,2012
4. fib, Model Code 2010, Fédération Internationale du Béton fib/International Federation for Structural Concrete, 2010.
5. B.W. Russell, N.H. Burns, Design guidelines for transfer, development and debonding of large diameter seven wire strands in pretensioned concrete girders, in: Research Report 1210-5F, Center for Transportation Research, the University of Texas at Austin, Austin, Texas, 1993.