1. D. Alciatore, Automation of a piping construction manipulator and development of a heuristic application-specific path planner. PhD Dissertation, Department of Civil Engineering, The University of Texas at Austin (1989).
2. Real-time position measurement integrated with CAD: technologies and their protocols;Beliveau;Journal of Construction Engineering and Management,1995
3. L., Bernold, X., Huang, CAD-integrated real-time control for robotic excavation and pipe-laying: development and field testing, Final Report, Federal Highway Administration (1996).
4. Y. Cho, Human-assisted rapid workspace modeling for construction equipment operations. PhD Dissertation, Department of Civil Engineering, The University of Texas at Austin, 2000.
5. Introduction to Robotics: Mechanics and Control;Craig,1986