1. Chinese AP1000s pass commissioning milestones, 2018. World Nuclear News; Available from: http://www.world-nuclear-news.org/NN-Chinese-AP1000s-pass-commissioning-milestones-2206184.html.
2. PWR circuit contamination assessment tool. Use of OSCAR code for engineering studies at EDF;Benfarah;EPJ Nucl. Sci. Technol.,2016
3. Modeling and simulation of corrosion product activity in pressurized water reactors under power perturbations;Deeba;Ann. Nucl. Energy,1999
4. Robustness of the MSHIM Operation and Control Strategy in the AP1000 Design, 17th International Conference on Nuclear Engineering (ICONE17);Drudy,2009
5. Calculation and analysis of water activation products source term in AP1000;Guo;Prog. Nucl. Energy,2018