Funder
State Grid Sichuan Electric Power Company Economic Research Institute
Reference8 articles.
1. Li, Y.Q., Chang, H.J., Ye, Z.S., Fang, F.F., Shi, Y., Yang, K., Cui, M.T.(2016). Analyses of ACME integral test results on CAP1400 small-break loss-of-coolant-accident transient, page or chapter numbers if relevant. Publisher, Place of publication. Progress in Nuclear Energy (88), State Nuclear Power Technology R & D Center, Beijing, China.
2. An evaluation of designed passive Core Makeup Tank (CMT) for China pressurized reactor (CPR1000). Annals of Nuclear Energy (56), 81–86, State Key Laboratory of Multiphase Flow in Power Engineering, Department of Nuclear;Wang,2013
3. The RELAP5 simulation of 2” loca of apex facility;Xie,2010
4. The SCDAP/RELAP5 3.2 model of AP1000 on SBLOCA