1. Alsmeyer, H., Cron, T., Fluhrer, B., Messemer, G., Miassoedov, A., Schmidt-Stiefel, S., and Wenz, T.(2007), The COMET-L3 Experiment on Long-Term Melt-Concrete Interaction and Cooling by Surface Flooding, FZKA 7244.
2. The influence of the water ingression and melt eruption model on the MELCOR code prediction of molten corium-concrete interaction in the APR-1400 reactor cavity;Amidu;NET,2022
3. Blose, R. E., Gronager, J. E., Suo-Anttila, A. J., & Brockman, J. E. (1987), SWISS: Sustained Heated Metallic Melt/Concrete Interactions With Overlying Water Pools. NUREG/CR-4727.
4. Blose, R. E., Powers, D. A., Copus, E. R., Brockmann, J. E., Simpson, R. B., & Lucero, D. A. (1993), Core-Concrete Interactions with Overlying Water Pools – The WETCOR-1 Test. NUREG/CR-5907.
5. Bonnet, Jean-Michel, (2017), State-of-the-Art Report on Molten Corium Concrete Interaction and Ex-Vessel Molten Core Coolability, OECD/NEA.