Risk-effective optimal maintenance regime for a periodically tested safety component subjected to imperfect repair
-
Published:2025-02
Issue:
Volume:211
Page:110902
-
ISSN:0306-4549
-
Container-title:Annals of Nuclear Energy
-
language:en
-
Short-container-title:Annals of Nuclear Energy
Author:
Parsaei S.,
Pirouzmand A.ORCID,
Nematollahi M.R.,
Ahmadi A.,
Zerehpoosh M.R.
Reference66 articles.
1. (AEOI)., A.E.O. I., PSA of Bushehr Nuclear Power Reactor. Probabilistic Safety Assessment Level 1, App. G. 2003.
2. The unavailability of systems under periodic test and maintenance;Apostolakis;Nucl. Technol.,1980
3. Multi-objective optimization of maintenance programs in nuclear power plants using Genetic Algorithm and Sensitivity Index decision making;Ayoobian;Ann. Nucl. Energy,2016
4. Carlos, Sofía, Ana Sánchez, Sebastián Martorell, and J-F. Villanueva. “Particle Swarm Optimization of safety components and systems of nuclear power plants under uncertain maintenance planning.” Advances in Engineering Software 50 (2012): 12-18.
5. Optimization of safety equipment outages improves safety;Čepin;Reliab. Eng. Syst. Saf.,2002