1. Commonwealth Edison Company, 1992. Zion Station Updated Final Safety Analysis Report.
2. CSNI: Committee on the Safety of Nuclear Installations (NEA, OECD), 2007, BEMUSE Phase III Report: Uncertainty and Sensitivity Analysis of the LOFT L2-5 Test, NEA/CSNI/R(2007)4.
3. CSNI: Committee on the Safety of Nuclear Installations (NEA, OECD), 2008, BEMUSE Phase IV Report: Simulation of a LB-LOCA in Zion Nuclear Power Plant, NEA/CSNI/R(2008)6/VOL1-3.
4. Dang, V.N., Kim, T.W., Zimmermann, M.A., Manera, A., 2010, Assessing safety margins: the impact of a power uprate on risk from small and medium LOCA scenarios. In: Proceedings of 10th International Probabilistic Safety Assessment and Management Conference (PSAM 10), Seattle, Washington, USA.
5. Hofer, E., Krzykacz, B., Ehrhardt, J., Fischer, F., Crick, M.J., Kelly, G.N., 1985. Uncertainty and sensitivity analysis of accident consequence submodels. In: Proceedings of International ANS/ENS Topical Meeting on Probabilistic Safety Methods and Applications, vol. 2. San Francisco, USA.