1. The risk analysis of the electrical Cross-tie for extended Station Blackout in Multi-Unit site;Alsuwaidi;Ann. Nucl. Energy,2020
2. AREVA, 2012. AREVA qualifies new hydrodynamic seal. Sealing Technology 2012.
3. ASME/ANS, 2013. ASME/ANS RA-Sb–2013, Addenda to ASME / ANS RA-S – 2008 Standard for Level 1 / Large Early Release Frequency Probabilistic Risk Assessment for Nuclear Power Plant Applications- The American Society of Mechanical Engineers. The American Society of Mechanical Engineers.
4. ENSREG, 2011. Annex 1 to the declaration of ENSREG: EU Stress Tests Specifications.
5. EPRI/NRC, 2012. EPRI / NRC-RES Fire Human Reliability Analysis Guidelines Final Report- EPRI 1023001-NUREG-1921-Electric Power Research Institute (EPRI)/ U.S. Nuclear Regulatory Commission (NRC).