1. Lessons Learned from 21 Nuclear Plant Probabilistic Risk Assessments;Garrick;Nucl. Technol.,1989
2. “NUREG/CR-1150: Severe Accident Risks: An Assessment For Five U.S. Nuclear Power Plants Final Summary Report,” U.S. Nuclear Regulatory Commission (2005).
3. “NUREG/CR-7110: State-of-the-Art Reactor Consequence Analyses Project. Volume 1: Peach Bottom Integrated Analysis,” U.S. Nuclear Regulatory Commission (2012).
4. “NUREG/CR-7110: State-of-the-Art Reactor Consequence Analyses Project. Volume 2: Surry Integrated Analysis,” U.S. Nuclear Regulatory Commission (2012)
5. A Survey of Dynamic Methodologies for Probabilistic Safety Assessment of Nuclear Power Plants;Aldemir;Ann. Nucl. Energy,2013