1. Apostolakis, G., 1993. A commentary on model uncertainty. In: Mosleh, A., Siu, N., Smidts, C., Lui, C. (Eds.), Proceedings of Workshop on Model Uncertainty: Its Characterization and Quantification, Annapolis, MD, October 20–22, 1993. Center for Reliability Engineering, University of Maryland, College Park, MD, 1993. Also published as Report NUREG/CP-0138, US Nuclear Regulatory Commission, Washington, DC.
2. American Society of Mechanical Engineers, 2002. Standard for Probabilistic Risk Assessment for Nuclear Power Plant Applications, ASME RA-S-2002, April 5, 2002. Addenda to ASME RA-S-2002, ASME RA-Sa-2003, December 5, 2003.
3. Light water reactor sequence timing: its significance to probabilistic safety assessment modeling;Bley;Reliability Engineering and System Safety,1988
4. The strengths and limitations of PSA: where we stand;Bley;Reliability Engineering and System Safety,1992
5. Budnitz, R., Apostolakis, G., Boore, D., Cluff, L., Coppersmith, K., Cornell, C., Morris, P., 1996. Recommendations for Probabilistic Seismic Hazard Analysis: Guidance on Uncertainty and the Use of Experts, Report NUREG/CR-6372, US Nuclear Regulatory Commission, Washington, DC.