1. Historical Review of Fire Safety at NPP and Application of Fire PSA to Westinghouse PWR NPP in the Frame of Risk-informed Decision Making;Asamoah,2018
2. Autodesk, February 2010. AUTOCAD 2011 User’s Guide.
3. Review and Evaluation of the Zion Probabilistic Safety Study;Berry,1984
4. Callan L., 1998. White Paper on Risk-Informed and Performance-Based Regulation. SECY-98-144, US Nuclear Regulatory Commission.
5. EPRI/NRC-RES fire PRA methodology for nuclear power facilities: Volume 1, Volume 2. EPRI 1011989 and NUREG/CR-6850, 2005.