1. ASME, Power Piping-ASME Code for Pressured Piping, B31, 2010.
2. Experimental and numerical investigation of supercritical CO2 test loop transient behavior near the critical point operation;Bae;Appl. Therm. Eng.,2016
3. Control Strategies for Supercritical Carbon Dioxide Power Conversion Systems;Carstens,2007
4. Development of a supercritical CO2 Brayton energy conversion system coupled with a sodium cooled fast reactor;Cha;Nucl. Eng. Technol.,2009
5. China National Nuclear Corporation, 2015. QinShan Nuclear Power Plant Unit 3&4 Final Safety Analysis Report, Chapter 15. (in Chinese).