1. Bammert, K., Deuster, G., 1976. The First Operating Experiences With the Oberhausen Helium Turbine Plant, Paper Presented at ASME Gas Turbine Conference, New Orleans, March 21–25, 1976.
2. Status report on closed-cycle power plants in the Federal Republic of Germany;Bammert;J. Eng. Gas Turbines Power,1977
3. Barend, W.B., Pieter, G.R., 2002. Simulation investigation of control options for full load rejection in the PBMR closed cycle gas turbine power plant. ASME Paper GT2002-30145, 2002.
4. Bentivoglio, F., Geffraye, G., 2006. Validation of the CATHARE Code Against Experimental Data from Brayton Cycle Plants, Paper C00000228 Proceedings of HTR 2006, Johannesburg, October 1–4, 2006.
5. Brey, H.L., Helium Gas Turbine Reactor Technical Challenges: A Characterization for Use in Focusing R&D Resources TP-114690.