1. 50Hertz, Amprion, APG, Creos, ČEPS, ELES, Elia, HOPS, MAVIR, PSE, RTE, SEPS, TenneT, Transelectrica, and TransnetBW, Explanatory note DA FB CC methodology for Core CCR: For Public Consultation. 2017. https://consultations.entsoe.eu/markets/core-da-ccm/user_uploads/explanatory-note-for-core-da-fb-cc-public-consultation_fv.pdf, accessed on 07.06.2019.
2. Integrating intermittent renewable wind generation-a stochastic multi-market electricity model for the european electricity market;Abrell;Netw Spat Econ,2015
3. ACER. ACER Decision on Core CCM: Annex I – Day-ahead capacity calculation methodology of the Core capacity calculation region. 2019b. https://www.creos-net.lu/fileadmin/dokumente/Creos_Luxembourg/pdf_codes_reseaux/CORE_CCM_Day_ahead.pdf, accessed on 12.05.2020.
4. ACER. Decision No 02/2019 of the Agency for the Cooperation of Energy Regulators of 21 February 2019: On the Core CCR TSOs’ proposals for the regional design of the day-ahead and intraday common capacity calculation methodologies. Agency for the Cooperation of Energy Regulators; 2019a. https://www.acer.europa.eu/Official_documents/Acts_of_the_Agency/Pages/Individual-decision.aspx, accessed on 07.06.2019.
5. Amprion. Amprion Market Report 2019 - Flow Based Market Coupling: Development of the Market and Grid Situation 2015-2018. 2019. https://www.amprion.net/Dokumente/Dialog/Downloads/Stellungnahmen/Amprion-Market-Report-2019.pdf, accessed on 07.06.2019.