Author:
Wang Shih-Jen,Chang Shih-Hsiin,Chien Chun-Sheng,Jeng Suh-Chyn
Subject
Mechanical Engineering,Waste Management and Disposal,Safety, Risk, Reliability and Quality,General Materials Science,Nuclear Energy and Engineering,Nuclear and High Energy Physics
Reference8 articles.
1. Kuosheng nuclear power station unit 1 and 2 control system design report;Dibb,1979
2. Kuosheng nuclear power station unit 2 startup test report PT-30B RPT trip of two pumps;Nicholls,1982
3. Kuosheng nuclear power station unit 1 generator load rejection startup test report;Orihel,1981
4. Development of the Chinshan plant analyzer and its assessment with plant data;Wang;Nucl. Technol.,1993