1. Boeing 787 from the ground up;Hale;Boeing AERO Mag.,2006
2. Airbus to start manufacturing parts for new A350 XWB in late ’09;Campbell;Creamer Media’s Eng. News,2009
3. Effect of alloying elements on machinability and hot workability of α-β titanium alloy containing Fe and C;Murakami;Kobelco Technol. Rev.,2011
4. Adhesive bonding of aircraft structures;Higgins;Int. J. Adhes. Adhes.,2000
5. Surface treatment of titanium for adhesive bonding to polymer composites: a review;Molitor;Int. J. Adhes. Adhes.,2001