1. Exploring the causes of delays in construction industry using a cause-and-effect diagram: case study for Iran;Abbasi;J. Architect. Eng.,2020
2. BIM-based combination of Takt-Time and Discrete Event Simulation for implementing Just-In-Time in construction scheduling under constraints;Abbasi;J. Construct. Eng. Manag.,2020
3. Integrating building information modeling and life cycle assessment tools to design;Abdulla,2012
4. Building Information Modelling Implementation Plans a Comparative Analysis;Ahmad,2012
5. Advancing green building rating systems using life-cycle assessment;Al-Ghamdi,2016