Author:
Kim Taehoon,Kim Yong-woo,Cho Hunhee
Funder
National Research Foundation of Korea
Ministry of Education
Subject
Industrial and Manufacturing Engineering,Strategy and Management,General Environmental Science,Renewable Energy, Sustainability and the Environment
Reference26 articles.
1. Flowshop scheduling model for bespoke precast concrete production planning;Benjaoran;Construct. Manag. Econ.,2005
2. A comparison of the accuracy of discrete event and discrete time;Buss,2010
3. A multi-heuristic GA for schedule repair in precast plant production;Chan,2003
4. Production scheduling for precast plants using a flow shop sequencing model;Chan;J. Comput. Civ. Eng.,2002
5. Optimizing profit and logistics for precast concrete production;Chen;Can. J. Civ. Eng.,2017
Cited by
72 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献