1. Development of the guyed tower;Mous;Soc. Pet. Eng. J., AIME,1985
2. Design criteria of a pile founded guyed tower;Mangiavacchi,1980
3. Design of the Lena guyed tower;Glassock,1984
4. Reliability considerations in offshore platform criteria;Bea;J. Struc. Div., ASCE,1980
5. Reliability procedure for fixed offshore platforms;Anderson;J. Struc. Div., ASCE,1982