1. Bianconi, G., Rigamonti, M., December 1992. Scaling, design, and verification of SPES-2. Westingtonhouse Corporation, Piacenza, Italy, WCAP-13277 Rev.1.
2. Boucher, T.J., Ortiz, M.G., Palmrose, D.E., Modro, S.M., Shultz, R.R., Bessette, D.E., Rhee, G.S., November 1994. Scaling and design of LSTF modification for AP600 testing. Idaho National Engineering Laboratory, Idaho Falls, Idaho, INEL-94/0200.
3. National Archives and Records Administration, January 1, 1995. Code of Federal Regulations, Title 10, Energy. US Government Printing Office, Washington, DC, (revised periodically).
4. Conway, L., April 1995. AP600 FHFP integral systems test specification. Westinghouse Corporation, Pittsburgh, Pennsylvania, WCAP-14053 rev 2.
5. Dilber, I., Bankoff, S.G., Tankin, R.S., Yuan, M.O., September 1981. Countercurrent steam/water flow above a perforated plate-vertical injection of water. US Nuclear Regulatory Commission, Washington, DC, NUREG/CR-2323.