1. Beijing Subway Development Plan. .
2. Beijing Subway Operation Company, 2002. Report on Survey among Passengers in Line 1 and Line 2 of Beijing Subway in 2001.
3. Relationship analysis on station capacity and passenger flow: a case of Beijing subway line 1;Chen;Journal of Transportation Systems Engineering and Information Technology,2009
4. Waiting time in emergency evacuation of crowded public transport terminals;Chow;Safety Science,2008
5. Chow, W.K., Zhu, J., 2007. Preliminary view on fire safety for rapid passenger rail system in China. In: Paper Presented in Annual Fire Conference 2007, Building and Fire Research Laboratory, National Institute of Standards and Technology, 4–5 April 2007, Gaithersburg, Maryland, USA.