1. Accidents in the construction industry in the Netherlands: an analysis of accident reports using Storybuilder;Ale;Reliab. Eng. Syst. Saf.,2008
2. Anderson, M., Denkl, M., 2010. The Heinrich Accident Triangle – too simplistic a model for HSE management in the 21st century. In: SPE International Conference on Health, Safety and Environment in Oil and Gas Exploration and Production, Brazil, 12–14 April 2010.
3. Baker, J., 2007. The Report of the BP US Refineries Independent Safety Review Panel. January 2007. (17.07.13).
4. Bellamy, L.J., Papazoglou, I.A., Hale, A.R., Aneziris, O.N., Ale, B.J.M., Morris, M.I., Oh, J.I.H., 1999. I-Risk: Development of an Integrated Technical and Management Risk Control and Monitoring Methodology for Managing and Quantifying On-site and Off-site Risks. Contract ENVA-CT96-0243. Report to European Union.
5. Bellamy, L.J., Oh, J.I.H., Ale, B.J.M., Whiston, J.Y., Mud, M.L., Baksteen, H., Hale, A.R., Papazoglou, I.A., 2006. Storybuilder: the new interface for accident analysis. In: Proceedings of the 8th International Conference on Probabilistic Safety Assessment and Management [PSAM], May 13–19, 2006, New Orleans. ASME, New York, 2006 (ISBN 0-7918-0244).