Author:
Li Meng,Yu Hongliang,Jin Hongyu,Liu Ping
Funder
National Natural Science Foundation of China
China Scholarship Council
Center of Service Science and Engineering
Wuhan University of Science and Technology
Subject
Public Health, Environmental and Occupational Health,Safety Research,Safety, Risk, Reliability and Quality
Reference37 articles.
1. Abroshan, M.R., 2017. Risk Assessment using Fuzzy FMEA (Case Study: Tehran Subway Tunneling Operations). Indian J. Sci. Technol. 10.
2. Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects;Aminbakhsh;J. Safety Res.,2013
3. Beard, A., Cope, D., 2008. Assessment of the Safety of Tunnels. Commissioned by the European Parliament via the committee on Science and Technology Options Assessment (STOA). report IP/A/STOA/FWC/2005-28/SC22/29. Published in February 2008 on the European Parliament website at/www. europarl. europa. e u. Accessible under the rubric of Science & Technology Options Assessment (STOA).
4. A methodology for assessing geotechnical hazards for TBM tunnelling—illustrated by the Athens Metro, Greece;Benardos;Int. J. Rock Mech. Mining Sci.,2004
5. Application research on information management system of metro safety protection zone based on GIS;Bihua;J. Safety Sci. Technol.,2016
Cited by
66 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献