1. The Analysis of Anticipate Transient without Trip of NingDe NPP Unit 1&2 (ATWT)[R];Jiang,2009
2. GNPS 1 & 2 - 18 MONTH FUEL CYCLES ANTICIPATED TRANSIENTS without TRIP (ATWT)[R]. France;Vennettlli,2001
3. Device & SYSTEM of 900MW PWR[M],2007
4. TNPS 1 and 2 Final Safety Analysis report[R];TSPN,2012
5. An Advanced Passive Plant AP1000[M];Chengge,2008