Author:
Li Zhi-Qiang,Xue Yiguo,Li Guangkun,Qiu Daohong,Xu Lei,Liu Qiushi,Fu Kang
Funder
Postdoctoral Innovation Project of Shandong Province
Ministry of Natural Resources of the People's Republic of China
National Natural Science Foundation of China
Natural Science Foundation of Shandong Province
Subject
Safety, Risk, Reliability and Quality,General Chemical Engineering,Environmental Chemistry,Environmental Engineering
Reference45 articles.
1. Water quality before and after deep tunnel operation in Milwaukee, Wisconsin;Ab Razak;Water Res.,2001
2. Geological engineering problems associated with tunnel construction in karst rock masses: The case of Gavarres tunnel (Spain);Alija;Eng. Geol.,2013
3. Pore pressures in front of tunnel, measurements, calculations and consequences for stability of tunnel face;Bezuijen;Mod. Tunn. Sci. Technol.,2020
4. Chu, H.D., 2017. Study on mechanism of water inrush and safety thickness of against-inrush layer in karst tunnel. China University of Geosciences.
5. Guo, J.Q., 2011. Study on against-inrush thickness and water burst mechanism of karst tunnel. Beijing Jiaotong University.